Welcome to the official website of Yunnan Yuanheng Membrane Structure Engineering Co., Ltd!
Project location: Tongzi County No.2 Middle School, Zunyi, Guizhou
Project area: 7586 square meters
Engineering steel: High frequency welded pipe with standard Q235 material specification, with a service life of 50 years
Engineering membrane material: PTFE membrane material, with a 20-year warranty
Case Introduction: The membrane structure project of Tongzi No.2 Middle School Sports Stadium is a government special funding project, which includes three connected membrane structure basketball courts and one membrane structure grandstand, all of which are made of permanent membrane material PTFE. The advantages of this membrane structure project are long service life, good self-cleaning, and will become increasingly white under sunlight. Eventually, it will remain in a white and transparent state, beautiful and elegant

